(408) 594-8072
Two new Schneider meter main panels installed in the same stucco wall
← Services

Panel Upgrades

A panel built for the house you live in now.

Call (408) 594-8072

Panel Upgrades

Most homes in the South Bay were wired for a fridge, a washer and a few lamps. Today the same panel is asked to carry an EV charger, a heat pump, an induction range and a home office that never turns off. When a panel is undersized or past its life, breakers trip, lights dim when the AC kicks on, and adding anything new becomes a question mark. Moreno Electrical Services replaces old fuse boxes, recalled and obsolete panels, and maxed out 100 amp services with modern panels sized for the way your household actually uses power. Every upgrade starts with a load calculation, so you know exactly what your home needs before anything is ordered. We pull the permit, coordinate the shutoff and reconnection with your utility, label every circuit clearly, and walk you through the finished panel before we leave. If an EV charger is on your list, we plan for it in the same job so you only open the wall once.

What's included

  • Load calculation to size the new panel correctly
  • Fuse box, Zinsco and Federal Pacific panel replacement
  • 100 amp to 200 amp service upgrades
  • Meter and main combination panels
  • Subpanels for garages, ADUs and additions
  • Permit, inspection and utility coordination
  • Grounding and bonding brought up to current code
  • Clear, typed circuit labeling

Signs it's time

When to call

  • Breakers trip when two big appliances run together
  • Lights dim or flicker when the AC or dryer starts
  • You still have screw in fuses
  • The panel is warm, buzzing or shows scorch marks
  • You are planning an EV charger, heat pump or remodel

Questions

Straight answers

What affects the cost of a panel upgrade?

The size of the new panel, whether the meter and service entrance also need replacing, how much wall or stucco work the location needs, permit fees in your city and the utility's requirements for the shutoff and reconnection. You get a written estimate after we see the job.

How long will my power be off?

For a straight panel swap, power is usually off for most of one working day. Service upgrades that need the utility to disconnect and reconnect can take longer, and we schedule those with you in advance so you can plan around it.

Do I need a panel upgrade to install an EV charger?

Not always. A load calculation tells us whether your current panel has room for a dedicated EV circuit. If it does not, we can upgrade the panel or look at load management options, and we will explain the tradeoffs either way.

On the job

Old meters out

Wall opened around the old twin meter sockets before a service change
Wall opened around the old twin meter sockets before a service change
Stucco cut back and new meter sockets roughed in during a service upgrade
Stucco cut back and new meter sockets roughed in during a service upgrade

Need panel upgrades?

Get an estimate